Call us any time (781)-307-0884
Call us any time (781)-307-0884

Pool and Patio

IMG_3830-1000h
Category:
Residential
Project:
Backyard Patio and Pool

Modern Pool Deck & Patio Installation in Southern MA

This residential project in Southern Massachusetts focused on building a clean, functional, and elegant poolside space that matched the modern design of the home. Mark D. wanted a durable surface that would provide both safety and style, creating a seamless transition from the home to the pool area for summer enjoyment and entertaining.

We poured and finished a smooth broom-texture concrete surface that wraps around the custom pool. The clean lines and minimalistic finish add a polished look to the backyard while maintaining maximum durability. This installation included precision edging, careful elevation management, and timing the pour to ensure consistent finishing across the expansive area.

IMG_3836-1000h
IMG_3996-1000h

The Challenge Of Project

With a large open layout and sharp geometry, the biggest challenge was achieving a uniform surface finish in direct summer sun. Concrete was poured in multiple phases with a tight window for setting and troweling to avoid cold joints or color variations. Proper drainage and slope management were also essential to prevent pooling near the home’s foundation.

Mark D.

Fast, Easy, and Amazing Looking!

I didn’t know concrete could look this good. The stamped pool deck completely changed the feel of our backyard. Can’t recommend them enough.

Frequently asked questions

Every backyard has its own layout, lifestyle needs, and design goals. These FAQs were based on Mark D.’s specific questions as we brought this custom pool patio to life.

Why was a broom finish used instead of a stamped pattern?

For this pool deck, the homeowner wanted a modern, clean look with better traction. Broom finishes offer slip resistance, especially when wet, making them ideal for pool areas.

All concrete has the potential to crack, but we use control joints and proper base prep to minimize cracking and ensure long-term performance.

Most broom-finished concrete can be walked on within 24–48 hours, but we recommend waiting 7 days before placing heavy furniture or starting construction on adjacent pool features.